Our website uses cookies to provide you with the best possible service. More information about the use of cookies on this website and how they can be disabled is available on our information page. With your consent, you confirm that you have read the information about the use of cookies and accept it. Please also note our further information on the subject of data privacy policy.

TDK TDK India Private Limited

BR6000 Installation

The BR6000 Power Factor Controller (six and twelve stages) offers highly intelligent control behavior provide many features to APFC panel. It is very user-friendly thanks to its menu-driven handling. The multifunctional display greatly simplifies installation, handling and maintenance.

Pre-requisites

Basic Requirements

The BR6000 is designed to be incorporated into the front panel of APFC-cabinet.

  • Requires a switchboard section of 138 x 138 mm to DIN 43700/IEC 61554
  • Inserted from the front and is attached by means of the appended clamps
  • May be inserted only by qualified technicians and must be operated in accordance with the specified safety regulations

Precautions

  • Before the BR6000 is connected up, all leads and cables must be checked to ensure that no current is flowing through them and the current converter must be short-circuited.
  • Care should be taken to ensure that the measuring voltage and current are in the correct phase position. The measuring-current circuit must be wired with copper leads of 2.5 mm².
  • The specified safety regulations must be observed.
  • The measuring voltage may lie in the range from 30 - 525 VAC and can be connected between L - N (default) or between L - L (programming of phase correction needed).
  • The operating voltage is 245 VAC +/- 20% (L-N).

Connection Plan

Mounting

Programmming


Introduction Installation Troubleshooting